Cost Guide 2025

House Extension Cost in Kensington

A house extension can transform your home, adding valuable living space. Costs cover foundations, structural work, roofing, glazing, internal fit-out, and connection to existing services. In Kensington (W8, W14), costs reflect the area's Prime Central London market position, with a 25% premium over London averages.

£3,125 – £6,875/sqm Estimated range for
Kensington (W8, W14)

House Extension Costs in Kensington

Kensington is a royal borough known for its grand Victorian and Edwardian architecture, Kensington Palace, and world-class cultural institutions. Properties range from large family houses to elegant mansion flats.

Specification Price per sqm Typical 25sqm Project Includes
Standard
Quality materials, clean design
£3,125 – £4,000 £78,125 – £100,000 All structural work, standard fixtures, full fit-out and decoration
Premium
Designer brands, bespoke elements
£4,000 – £5,000 £100,000 – £125,000 Premium materials, designer fixtures, underfloor heating, smart controls
Luxury
Finest materials, fully bespoke
£5,000 – £6,875 £125,000 – £171,875 Bespoke joinery, natural stone, top-tier appliances, architectural detailing

Prices include VAT and are based on Kensington (W8, W14) market rates. Prime Central London pricing reflects the premium specification expectations and specialist requirements typical in this area. Actual costs depend on site-specific factors. All prices are guide estimates for 2025.

A 25sqm House Extension in Kensington

Here's what a typical 25sqm house extension project would cost in Kensington at each specification level.

Standard
£78,125 – £100,000
25sqm at £3,125–£4,000/sqm
Quality materials, clean finish
Premium
£100,000 – £125,000
25sqm at £4,000–£5,000/sqm
Designer brands, bespoke elements
Luxury
£125,000 – £171,875
25sqm at £5,000–£6,875/sqm
Finest materials, fully bespoke

What Affects House Extension Costs in Kensington

RBKC has extensive conservation area coverage across Kensington. The council has some of London's strictest planning policies, particularly regarding basement developments and roof alterations.

Key streets and roads in Kensington include Kensington Square, Phillimore Gardens, Holland Park, Camden Hill Road, Victoria Road. Properties in these locations often have specific architectural characteristics that influence renovation costs, including RBKC stringent planning requirements, basement construction method statements required, noise and construction hour restrictions, high-value period features requiring specialist restoration.

  • Foundation requirements and ground conditions
  • Proximity to boundaries and neighbours
  • Roof design — flat, pitched or glazed
  • Level of glazing and bi-fold doors
  • Connection to existing structure

Kensington Area Profile

Postcodes: W8, W14

Market tier: Prime Central London

Price adjustment: +25% vs base London rates

Kensington is a royal borough known for its grand Victorian and Edwardian architecture, Kensington Palace, and world-class cultural institutions. Properties range from large family houses to elegant mansion flats.

Kensington: ×1.25 multiplier

Get a Precise Quote for Your Kensington Project

Every house extension is unique. Let our RIBA chartered architects provide a detailed, no-obligation estimate tailored to your property and specification.

Use our interactive calculator for a personalised estimate

House Extension in Kensington — FAQs

How much does a house extension cost in Kensington?
House extensions in Kensington cost between £2,200-£4,000/sqm depending on specification. A standard 25sqm rear extension starts around £55,000, while a premium specification with high-end finishes can exceed £80,000-£100,000.
Do I need planning permission for a house extension in Kensington?
Many single-storey rear extensions of up to 6m (detached) or 3m (terraced/semi) fall under permitted development. However, properties in conservation areas in Kensington often have restricted PD rights. We provide full planning guidance for every project.
How long does a house extension take in Kensington?
A typical ground-floor rear extension takes 10-16 weeks on site. Side-return extensions are often quicker at 8-12 weeks. Double-storey extensions may take 14-20 weeks. Access constraints in Kensington can affect programme.
Chat with us!