Cost Guide 2025

Full Refurbishment Cost in South Kensington

A full house refurbishment covers every aspect of renovation — structural repairs, new electrics and plumbing, plastering, joinery, flooring, kitchen, bathrooms, decoration and landscaping. It is the most comprehensive renovation service. In South Kensington (SW7), costs reflect the area's Prime Central London market position, with a 25% premium over London averages.

£1,500 – £5,000/sqm Estimated range for
South Kensington (SW7)

Full Refurbishment Costs in South Kensington

South Kensington is a prestigious area home to world-renowned museums, embassies, and some of London's finest stucco-fronted terraces. Properties here command premium prices and demand the highest quality renovation.

Specification Price per sqm Typical 120sqm Project Includes
Standard
Quality materials, clean design
£1,500 – £2,250 £180,000 – £270,000 All structural work, standard fixtures, full fit-out and decoration
Premium
Designer brands, bespoke elements
£2,250 – £3,500 £270,000 – £420,000 Premium materials, designer fixtures, underfloor heating, smart controls
Luxury
Finest materials, fully bespoke
£3,500 – £5,000 £420,000 – £600,000 Bespoke joinery, natural stone, top-tier appliances, architectural detailing

Prices include VAT and are based on South Kensington (SW7) market rates. Prime Central London pricing reflects the premium specification expectations and specialist requirements typical in this area. Actual costs depend on site-specific factors. All prices are guide estimates for 2025.

A 120sqm Full Refurbishment in South Kensington

Here's what a typical 120sqm full refurbishment project would cost in South Kensington at each specification level.

Standard
£180,000 – £270,000
120sqm at £1,500–£2,250/sqm
Quality materials, clean finish
Premium
£270,000 – £420,000
120sqm at £2,250–£3,500/sqm
Designer brands, bespoke elements
Luxury
£420,000 – £600,000
120sqm at £3,500–£5,000/sqm
Finest materials, fully bespoke

What Affects Full Refurbishment Costs in South Kensington

Extensive conservation areas across South Kensington strictly control all external alterations. White stucco facades must be maintained to exact specifications.

Key streets and roads in South Kensington include Onslow Square, Pelham Crescent, Thurloe Square, Sumner Place, Queen's Gate. Properties in these locations often have specific architectural characteristics that influence renovation costs, including stucco facade maintenance requirements, RBKC basement development restrictions, embassy security considerations, premium specification expectations.

  • Property age and structural condition
  • Number of bathrooms and kitchens
  • Level of period feature restoration
  • Energy efficiency upgrades
  • Smart home technology integration

South Kensington Area Profile

Postcodes: SW7

Market tier: Prime Central London

Price adjustment: +25% vs base London rates

South Kensington is a prestigious area home to world-renowned museums, embassies, and some of London's finest stucco-fronted terraces. Properties here command premium prices and demand the highest quality renovation.

South Kensington: ×1.25 multiplier

Get a Precise Quote for Your South Kensington Project

Every full refurbishment is unique. Let our RIBA chartered architects provide a detailed, no-obligation estimate tailored to your property and specification.

Use our interactive calculator for a personalised estimate

Full Refurbishment in South Kensington — FAQs

How much does a full refurbishment cost in South Kensington?
Full refurbishments in South Kensington typically cost between £800-£2,800/sqm. For a 120sqm house, expect £96,000-£144,000 for standard specification, £144,000-£216,000 for premium, and £216,000-£336,000 for luxury with bespoke joinery and high-end finishes.
How long does a full refurbishment take in South Kensington?
A full refurbishment of a typical South Kensington property takes 4-8 months depending on scope. Period properties requiring heritage-sensitive work may take longer. We provide a detailed programme before works begin.
Should I move out during a full refurbishment?
For a full refurbishment, we strongly recommend moving out. The works involve disconnection of services, structural alterations, and significant dust and noise. Most South Kensington clients find temporary accommodation for 4-6 months.
Chat with us!