Cost Guide 2025

Full Refurbishment Cost in Battersea

A full house refurbishment covers every aspect of renovation — structural repairs, new electrics and plumbing, plastering, joinery, flooring, kitchen, bathrooms, decoration and landscaping. It is the most comprehensive renovation service. In Battersea (SW11, SW8), costs reflect the area's Inner London market position, with a 5% premium over London averages.

£1,260 – £4,200/sqm Estimated range for
Battersea (SW11, SW8)

Full Refurbishment Costs in Battersea

Battersea has undergone a remarkable transformation, with the regeneration around Battersea Power Station complementing its established Victorian residential streets. The area offers a mix of period houses and modern developments.

Specification Price per sqm Typical 120sqm Project Includes
Standard
Quality materials, clean design
£1,260 – £1,890 £151,200 – £226,800 All structural work, standard fixtures, full fit-out and decoration
Premium
Designer brands, bespoke elements
£1,890 – £2,940 £226,800 – £352,800 Premium materials, designer fixtures, underfloor heating, smart controls
Luxury
Finest materials, fully bespoke
£2,940 – £4,200 £352,800 – £504,000 Bespoke joinery, natural stone, top-tier appliances, architectural detailing

Prices include VAT and are based on Battersea (SW11, SW8) market rates. Prices reflect Inner London market conditions and local construction costs. Actual costs depend on site-specific factors. All prices are guide estimates for 2025.

A 120sqm Full Refurbishment in Battersea

Here's what a typical 120sqm full refurbishment project would cost in Battersea at each specification level.

Standard
£151,200 – £226,800
120sqm at £1,260–£1,890/sqm
Quality materials, clean finish
Premium
£226,800 – £352,800
120sqm at £1,890–£2,940/sqm
Designer brands, bespoke elements
Luxury
£352,800 – £504,000
120sqm at £2,940–£4,200/sqm
Finest materials, fully bespoke

What Affects Full Refurbishment Costs in Battersea

Battersea has conservation areas around the Park, Shaftesbury Estate, and along Lavender Hill. Victorian terraces in the Northcote Road area are popular renovation candidates.

Key streets and roads in Battersea include Northcote Road, Mallinson Road, Bolingbroke Grove, Clapham Common North Side, Battersea Church Road. Properties in these locations often have specific architectural characteristics that influence renovation costs, including Thames flood zone considerations, varied building conditions, good construction access, regeneration area premiums near Power Station.

  • Property age and structural condition
  • Number of bathrooms and kitchens
  • Level of period feature restoration
  • Energy efficiency upgrades
  • Smart home technology integration

Battersea Area Profile

Postcodes: SW11, SW8

Market tier: Inner London

Price adjustment: +5% vs base London rates

Battersea has undergone a remarkable transformation, with the regeneration around Battersea Power Station complementing its established Victorian residential streets. The area offers a mix of period houses and modern developments.

Battersea: ×1.05 multiplier

Get a Precise Quote for Your Battersea Project

Every full refurbishment is unique. Let our RIBA chartered architects provide a detailed, no-obligation estimate tailored to your property and specification.

Use our interactive calculator for a personalised estimate

Full Refurbishment in Battersea — FAQs

How much does a full refurbishment cost in Battersea?
Full refurbishments in Battersea typically cost between £800-£2,800/sqm. For a 120sqm house, expect £96,000-£144,000 for standard specification, £144,000-£216,000 for premium, and £216,000-£336,000 for luxury with bespoke joinery and high-end finishes.
How long does a full refurbishment take in Battersea?
A full refurbishment of a typical Battersea property takes 4-8 months depending on scope. Period properties requiring heritage-sensitive work may take longer. We provide a detailed programme before works begin.
Should I move out during a full refurbishment?
For a full refurbishment, we strongly recommend moving out. The works involve disconnection of services, structural alterations, and significant dust and noise. Most Battersea clients find temporary accommodation for 4-6 months.
Chat with us!