Party Wall Agreements Guide for London

Published by Hampstead Renovations | November 2024

If you're planning building work in London—whether a loft conversion, basement excavation, extension, or structural alterations—you'll likely need to navigate the Party Wall etc. Act 1996. This legislation protects both building owners undertaking work and adjoining owners who might be affected. Understanding the process, requirements, and costs of party wall agreements is essential for avoiding disputes, delays, and potential legal action. This comprehensive guide explains everything London property owners need to know about party walls.

What is the Party Wall Act?

Approved architectural drawings for London house extension project Planning permission documents and building regulations approval for renovation Party wall surveyor inspection of terraced property in North West London

The Party Wall etc. Act 1996 provides a framework for preventing and resolving disputes in relation to party walls, boundary walls, and excavations near neighbouring buildings. It applies throughout England and Wales and is particularly important in London where terraced and semi-detached properties with shared walls are common.

The Act gives building owners rights to carry out certain works while also protecting the interests of adjoining owners. Crucially, it's a civil matter—local authorities don't enforce it. If you don't comply, your neighbour can seek an injunction stopping your work and claim damages.

What is a Party Wall?

Under the Act, a party wall is:

Party structures can also include floors and other parts of buildings shared between properties (common in conversions and flats).

When Do You Need Party Wall Agreements?

The Act covers three types of work:

1. Work Directly to Party Walls (Section 2):

2. Building New Walls on or at Boundaries (Section 1):

3. Excavation Near Neighbouring Buildings (Section 6):

This commonly applies to basement conversions, new extensions with deep foundations, and underpinning works.

Works Not Requiring Party Wall Agreements

Not all work needs party wall procedures:

When in doubt, consult a party wall surveyor—proceeding incorrectly can cause serious problems.

The Party Wall Process: Step-by-Step

Step 1: Prepare Detailed Plans

Before serving notices, prepare detailed drawings showing:

Step 2: Serve Party Wall Notices

You must serve notices to all adjoining owners (neighbours sharing party walls or affected by excavations) at least:

Notices must be in writing and include:

Serve notices to all affected owners—if a property has multiple owners (e.g., mortgaged properties), serve all of them.

Step 3: Wait for Response

Your neighbour has 14 days to respond. They can:

Many neighbours don't respond simply because they're unfamiliar with the process, not because they object. Non-response is treated as dissent, triggering surveyor appointment.

Step 4: Appoint Surveyors (If Dispute Arises)

When neighbours dissent or don't respond, surveyors must be appointed. Three options exist:

The building owner (you, undertaking the work) pays all reasonable surveyor fees, even your neighbour's surveyor if they appoint one.

Step 5: Schedule of Condition

Surveyors inspect and document the current condition of neighbouring properties through:

This provides a baseline to assess any damage caused by your works. Neighbours must provide reasonable access for this inspection.

Step 6: Party Wall Award

Surveyors prepare a Party Wall Award—a legal document detailing:

Both parties receive copies. Once served, works can commence. The Award is binding and can be enforced through courts if necessary.

Step 7: Undertake Works

Carry out works in accordance with the Award. If you deviate from what's agreed, you may be in breach, potentially facing injunctions or damages claims.

Step 8: Post-Work Inspection

After completion, surveyors may inspect neighbouring properties again to identify any damage caused. If damage occurred, you're responsible for making good or compensating your neighbour.

Costs of Party Wall Agreements

The building owner pays all party wall costs, including neighbours' surveyor fees if they appoint one:

Agreed Surveyor (one surveyor for both parties): £1,000-£2,500

Two Surveyors (each party appoints their own): £2,500-£5,000

Complex Projects: £5,000-£10,000+

Costs typically cover:

Common Mistakes and How to Avoid Them

Starting Work Without Serving Notices: The most serious mistake. Neighbours can seek injunctions stopping your work and claim damages. Always serve proper notices with adequate notice periods.

Serving Notices Too Late: Remember the two-month (Section 2) or one-month (Sections 1 and 6) notice periods. Starting work earlier than stated in your notice is a breach.

Incomplete or Vague Notices: Notices must clearly detail proposed works. Vague descriptions can be challenged. Include proper drawings and specifications.

Not Serving All Affected Owners: If excavating, you must serve notices to all properties within the relevant distance (3m or 6m). Missing someone can cause problems.

Assuming Consent Means No Need for Precautions: Even with consent, create schedules of condition to protect yourself against unfounded damage claims.

Ignoring the Award Terms: Once an Award is agreed, you must follow it. Deviating from agreed working hours, methods, or scope breaches the Award.

DIY Approach for Complex Works: While property owners can technically handle party wall matters themselves, professional surveyors are strongly recommended, particularly for substantial projects. Mistakes can be very costly.

Your Rights as a Building Owner

The Act gives you important rights:

However, these rights come with responsibilities—you must follow proper procedures, compensate for any damage, and work reasonably to minimise disturbance.

Your Neighbour's Rights

Understanding your neighbour's rights helps ensure smooth processes:

Maintaining good relationships with neighbours makes the process much smoother, even when formal procedures are required.

Party Walls in Different Property Types

Terraced Houses: Typically have party walls on both sides. Most extensions, lofts, or basements require party wall notices to both neighbours.

Semi-Detached Houses: One party wall, usually requiring notice to one neighbour for most works.

Detached Houses: No party walls, but excavation works within 3-6 metres of neighbouring properties still trigger Section 6 requirements.

Flats: Can be complex with party walls, party floors, and multiple owners in the same building. May need notices to multiple neighbours above, below, and beside.

Resolving Disputes

If disputes arise despite the Award:

Most disputes resolve through professional surveyor involvement without court action.

Expert Renovation with Party Wall Compliance

Hampstead Renovations manages all aspects of party wall procedures for projects across North West London. We work with experienced party wall surveyors to ensure full compliance, protecting both you and your neighbours throughout construction projects.

Call: 07459 345456 | Email: contact@hampsteadrenovations.co.uk

Free Resource

Download The 2026 Hampstead Renovation Guide

Planning a renovation? Get our exclusive guide on costs, planning permissions, and design trends for North West London in 2026.

Chat with us! Call Now: 07459 345456
Wait! Before You Go...

Don't Start Your Renovation Alone

Join 500+ Hampstead homeowners who receive our monthly design tips and local planning updates.