Planning a house extension is one of the most significant home improvement projects you can undertake. Whether you're looking to create additional living space, add value to your property, or accommodate a growing family, proper planning is essential for success. This comprehensive guide walks you through every stage of planning your house extension, from initial concepts to final preparations for construction.

Quick Extension Planning Facts:

  • Average planning time: 3-6 months
  • Planning permission success rate: 88% for extensions
  • Average ROI: 60-75% of investment
  • Most popular type: Single-storey rear extensions

Table of Contents

  1. Assessing Your Needs and Goals
  2. Understanding Extension Types
  3. Setting Your Budget
  4. Design Considerations
  5. Planning Permission Process
  6. Building Regulations
  7. Choosing Professionals
  8. Project Timeline
  9. Preparing for Construction
  10. Common Mistakes to Avoid

1. Assessing Your Needs and Goals

Before diving into designs and drawings, it's crucial to clearly define why you want an extension and what you hope to achieve. This foundational step will guide all subsequent decisions and help ensure your extension meets your long-term needs.

Define Your Objectives

Start by asking yourself fundamental questions about your extension project:

  • Space Requirements: What additional rooms or areas do you need? Consider both current and future needs
  • Lifestyle Enhancement: How will the extension improve your daily living? Think about traffic flow and family dynamics
  • Property Value: Are you planning to stay long-term or considering resale value?
  • Budget Constraints: What can you realistically afford, including a contingency fund?
Family discussing extension plans

Evaluate Your Current Property

Conduct a thorough assessment of your existing home to understand how an extension will integrate:

  • Measure available land and identify boundaries
  • Consider the orientation for natural light
  • Assess the condition of existing structures
  • Identify any potential obstacles (trees, drains, utilities)
  • Review any restrictive covenants on your property deed

Professional Tip:

Create a wish list ranking features from essential to nice-to-have. This helps when making compromises due to budget or planning constraints.

2. Understanding Extension Types

Choosing the right type of extension depends on your property layout, available space, budget, and specific requirements. Each type offers different benefits and comes with unique considerations.

Single-Storey Rear Extension

The most popular choice for UK homeowners, single-storey rear extensions typically extend into the garden to create larger kitchens, dining areas, or open-plan living spaces.

  • Cost: £15,000 - £30,000
  • Planning: Often covered by Permitted Development Rights
  • Timeline: 3-4 months construction
  • Best for: Creating kitchen-diners and family spaces

Side Return Extension

Popular in Victorian terraced houses, side return extensions utilise the narrow alley alongside the property, particularly effective in London properties.

  • Cost: £20,000 - £35,000
  • Planning: Usually requires planning permission
  • Timeline: 3-4 months construction
  • Best for: Narrow terraced houses with side passages
Different types of house extensions

Double-Storey Extension

Providing maximum additional space, double-storey extensions add rooms on both ground and first floors, offering excellent value per square metre.

  • Cost: £30,000 - £60,000
  • Planning: Requires planning permission
  • Timeline: 4-6 months construction
  • Best for: Growing families needing multiple rooms

Wrap-Around Extension

Combining side return and rear extensions, wrap-around extensions create dramatic transformations, particularly suited to corner plots or larger gardens.

  • Cost: £35,000 - £70,000
  • Planning: Always requires planning permission
  • Timeline: 4-6 months construction
  • Best for: Complete ground floor transformations

For more options, explore our guides on glass box extensions and contemporary extension designs .

3. Setting Your Budget

Establishing a realistic budget early in the planning process is crucial for project success. Extension costs vary significantly based on size, specification, location, and complexity.

Cost Breakdown

Understanding where your money goes helps in making informed decisions:

Element Percentage of Budget Typical Cost Range
Construction & Labour 40-50% £600-£1,000 per m²
Materials & Supplies 25-30% £400-£600 per m²
Windows & Doors 10-15% £3,000-£10,000
Professional Fees 10-15% £2,000-£5,000
Planning & Regulations 2-5% £500-£2,000
Contingency 10-15% 10% minimum recommended

Factors Affecting Costs

  • Location: London and Southeast typically 20-30% higher
  • Access: Difficult access can increase costs by 10-15%
  • Specification: High-end finishes can double basic costs
  • Structural Work: Steel frames and foundations impact significantly
  • Services: Relocating utilities adds substantial costs

Calculate Your Extension Costs

Use our extension cost calculator for a detailed estimate based on your specific requirements.

4. Design Considerations

Good design is the cornerstone of a successful extension. It's not just about adding space; it's about creating areas that enhance your lifestyle while complementing your existing home.

Architectural Harmony

Your extension should feel like a natural part of your home, not an obvious addition:

  • Materials: Match or complement existing materials for cohesion
  • Rooflines: Consider how the new roof integrates with the existing
  • Window Styles: Maintain consistency or create deliberate contrast
  • Proportions: Ensure the extension doesn't overwhelm the original building
Extension design considerations

Internal Layout

The internal configuration is crucial for functionality:

  • Flow: Create natural pathways between old and new spaces
  • Zones: Define areas for different activities
  • Storage: Incorporate adequate storage solutions
  • Flexibility: Design spaces that can adapt to changing needs

Natural Light Strategies

Maximising natural light transforms the feel of your extension:

  • Bi-fold or sliding doors for garden connections
  • Rooflights or skylights for overhead illumination
  • Picture windows framing garden views
  • Glass gables for dramatic height and light
  • Internal glazing to share light with existing rooms

Energy Efficiency

Modern extensions should meet high energy standards:

  • High-performance glazing (minimum double, consider triple)
  • Superior insulation exceeding building regulations
  • Airtight construction to prevent heat loss
  • Underfloor heating for efficient warmth
  • Consider renewable energy integration

Learn more about energy-efficient extension designs and sustainable building practices.

5. Planning Permission Process

Understanding planning requirements is essential for avoiding delays and ensuring your extension proceeds smoothly. Whilst some extensions fall under Permitted Development Rights (PDR), many require formal planning permission.

Permitted Development Rights

Many single-storey rear extensions can be built under PDR without planning permission, subject to limits:

  • 6 metres for attached houses (8m under larger home extension scheme)
  • Maximum height of 4 metres
  • Maximum eaves height of 3 metres
  • No more than half the garden covered by extensions
  • Materials similar in appearance to existing house

Important Note:

PDR may be restricted in conservation areas, listed buildings, or areas with Article 4 directions. Always check with your local planning authority.

When Planning Permission is Required

  • Extensions exceeding PDR size limits
  • Two-storey extensions
  • Extensions to listed buildings
  • Properties in conservation areas (for certain works)
  • Flats and maisonettes (always required)

The Application Process

  1. Pre-application Advice (Optional): Discuss plans with planners before submitting (£500-£1,000)
  2. Prepare Documentation: Drawings, plans, design statements
  3. Submit Application: Online via Planning Portal (£206 standard fee)
  4. Validation: Council checks completeness (5-10 days)
  5. Consultation: Neighbours notified, 21 days to comment
  6. Assessment: Planner evaluates against policies
  7. Decision: Usually within 8 weeks (13 weeks for major)
Planning permission timeline infographic

6. Building Regulations

Unlike planning permission, which focuses on appearance and impact, building regulations ensure your extension is safe, energy-efficient, and accessible. Building regulations approval is always required for extensions.

Key Areas Covered

  • Structure: Foundations, walls, and structural stability
  • Fire Safety: Escape routes, fire resistance, alarms
  • Insulation: Thermal efficiency standards
  • Ventilation: Adequate air flow and extraction
  • Electrical Safety: Part P compliance for electrics
  • Accessibility: Level access where reasonable

Application Routes

Full Plans Application

  • Detailed drawings submitted before work starts
  • Approval received before commencement
  • Provides certainty but takes 5-8 weeks
  • Recommended for complex projects

Building Notice

  • Minimal information required upfront
  • Can start work 48 hours after submission
  • Higher risk if issues discovered during build
  • Suitable for simple projects

Building Control Fees:

  • Plan assessment: £200-£300
  • Site inspections: £300-£500
  • Completion certificate: Included
  • Total typical cost: £500-£800

7. Choosing Professionals

Selecting the right team is crucial for your extension's success. Each professional brings specific expertise that contributes to a smooth project delivery.

Architect or Architectural Designer

Responsible for creating the design and often manageing planning applications:

  • Fees: 3-7% of build cost or fixed fee £2,000-£5,000
  • Services: Concept design, planning drawings, building regulations
  • When needed: Complex designs, planning challenges, design focus
  • Check: RIBA or ARB registration for architects

Structural Engineer

Essential for extensions requiring structural calculations:

  • Fees: £500-£2,000 depending on complexity
  • Services: Beam calculations, foundation design, structural drawings
  • When needed: Removing walls, large spans, difficult ground
  • Check: IStructE or ICE membership

Builder/Main Contractor

Responsible for construction and often coordinating subcontractors:

  • Selection criteria: References, insurance, previous work
  • Contract types: Fixed price vs. day rate
  • Payment terms: Stage payments, never pay upfront
  • Check: Federation of Master Builders membership
Meeting with extension professionals

Project Manager

Optional but valuable for larger or complex projects:

  • Fees: 5-10% of project cost
  • Benefits: Coordination, quality control, problem solving
  • When worthwhile: Projects over £50,000 or limited time

Read our guide on choosing the right contractor for detailed selection advice.

8. Project Timeline

Understanding the typical timeline helps you plan effectively and set realistic expectations. Most extensions take 6-12 months from initial concept to completion.

Detailed Timeline Breakdown

Weeks 1-4: Initial Planning

  • Define requirements and budget
  • Research and appoint architect
  • Site survey and measurements

Weeks 5-8: Design Development

  • Concept designs and revisions
  • Finalise design proposal
  • Prepare planning application

Weeks 9-16: Planning Permission

  • Submit planning application
  • Neighbour consultation period
  • Planning decision (8 weeks standard)

Weeks 17-20: Building Regulations

  • Detailed technical drawings
  • Structural calculations
  • Submit building regulations

Weeks 21-24: Tender Process

  • Prepare tender package
  • Obtain 3-4 quotes
  • Select contractor
  • Finalise contract

Weeks 25-40: Construction

  • Site setup and foundations (2-3 weeks)
  • Structure and roof (3-4 weeks)
  • Windows and weatherproofing (1-2 weeks)
  • First fix services (2-3 weeks)
  • Plastering and second fix (2-3 weeks)
  • Decoration and snagging (1-2 weeks)

Factors Affecting Timeline

  • Planning delays or appeals can add 3-6 months
  • Complex designs require longer planning stages
  • Weather impacts winter construction
  • Material availability and lead times
  • Changes during construction cause delays

9. Preparing for Construction

Proper preparation before construction begins can significantly reduce stress and ensure the project runs smoothly.

Legal and Administrative Tasks

  • Party Wall Agreement: Serve notice 2 months before work if needed
  • Building Insurance: Inform insurer and check coverage
  • Contract: Sign detailed contract with payment schedule
  • Warranties: Understand what guarantees are provided
  • CDM Regulations: Ensure compliance for health and safety

Site Preparation

  • Clear the construction area of furniture and belongings
  • Protect remaining areas with dust sheets and barriers
  • Create storage space for materials
  • Establish site access routes
  • Remove or protect valuable plants
  • Set up temporary facilities if needed
Construction site preparation

Living Arrangements

Decide how you'll manage during construction:

  • Stay in residence: Set up temporary kitchen/bathroom if needed
  • Partial move out: Use unaffected rooms only
  • Complete move out: Consider for major works or young children
  • Security: Ensure site is secured each evening

Communication Protocol

  • Establish single point of contact with contractor
  • Agree regular progress meetings
  • Set up communication channels (WhatsApp, email)
  • Document decisions and changes in writing
  • Inform neighbours of schedule and contact details

See our guide on living through renovation for more detailed advice.

10. Common Mistakes to Avoid

Learning from others' experiences can help you avoid costly and stressful mistakes during your extension project.

Planning Phase Mistakes

1. Underestimating Costs

  • Not including VAT in budget calculations
  • Forgetting professional fees and permissions
  • Insufficient contingency fund (minimum 10-15%)
  • Not budgeting for finishing touches and decoration

2. Poor Space Planning

  • Not considering furniture placement
  • Inadequate storage provision
  • Ignoring circulation and flow
  • Forgetting about services and radiator positions

3. Ignoring Future Needs

  • Not planning for family changes
  • Overlooking ageing-in-place considerations
  • Missing opportunities for future expansion
  • Not considering resale implications

Design and Permission Mistakes

4. Skipping Professional Input

  • Not using an architect for complex projects
  • Avoiding structural engineer when needed
  • DIY drawings that don't meet standards
  • Not getting party wall agreements

5. Planning Permission Pitfalls

  • Assuming permitted development rights apply
  • Not checking local restrictions
  • Ignoring neighbour concerns
  • Starting work before approval

Construction Phase Mistakes

6. Contractor Selection Errors

  • Choosing on price alone
  • Not checking references and insurance
  • Accepting verbal quotes
  • Paying large deposits upfront

7. Project Management Issues

  • Making changes during construction
  • Not documenting decisions
  • Poor communication with contractors
  • Not maintaining quality control

Key Takeaway:

Most extension problems stem from inadequate planning and poor communication. Invest time upfront in thorough planning and maintain clear, documented communication throughout the project.

Conclusion: Your Extension Journey

Planning a house extension is a significant undertaking that requires careful consideration, thorough preparation, and attention to detail. By following this comprehensive guide, you're well-equipped to navigate the process from initial concept to construction-ready plans.

Key Success Factors

  • Start with clear objectives and realistic budgets
  • Invest in good design and professional advice
  • Allow adequate time for planning and permissions
  • Choose contractors carefully and document everything
  • Maintain flexibility and expect the unexpected

Remember that while the planning process may seem overwhelming, taking it step by step and seeking professional guidance when needed will lead to a successful extension that enhances your home and lifestyle for years to come.

Ready to Start Your Extension?

Our experienced team at Hampstead Renovations & Extensions can guide you through every stage of your extension project. From initial design to final completion, we ensure a smooth, stress-free process.

Get Your Free Consultation

About the Author

James Mitchell

James Mitchell

James is a chartered architect with over 15 years of experience in residential extensions and renovations. He specialises in helping homeowners navigate the planning process and create beautiful, functional spaces that enhance their properties. James regularly contributes to architecture journals and speaks at home improvement exhibitions.

Free Resource

Download The 2026 Hampstead Renovation Guide

Planning a renovation? Get our exclusive guide on costs, planning permissions, and design trends for North West London in 2026.

Chat with us! Call Now: 07459 345456
Wait! Before You Go...

Don't Start Your Renovation Alone

Join 500+ Hampstead homeowners who receive our monthly design tips and local planning updates.