## Earl’s Court lofts: what is involved

The Earl’s Court Square appraisal describes terraced houses, semi-detached houses and mansion blocks of mid-late Victorian date between Earl’s Court Road, Warwick Road and Old Brompton Road. Nevern Square’s takes in Nevern Road, Trebovir Road, Longridge Road and Templeton Place; Philbeach’s covers Eardley Crescent, Kempsford Gardens and Philbeach Gardens; and Earl’s Court Village, designated in 1973, has kept the vast majority of its original roof forms.

Three questions shape a loft here. Does your terrace keep its original parapet line, or is it already a row of mansards with gaps? Is your roof hipped, as on the semi-detached villas of Earl’s Court Road, where a dormer rather than a storey is the question? And is the building listed, or a flat, which changes the consents?

## Dormers on the hipped roofs of Earl’s Court Road’s villas

RBKC’s Earl’s Court Square appraisal, adopted on 6 June 2016, says the semi-detached villa houses along Earl’s Court Road were designed with hipped roofs, still a dominant characteristic. A number have since gained dormers: some respect the character and proportions of the original house, while others are poorly designed and use inappropriate materials that detract from the composition. The appraisal, written before the Local Plan 2024, cites superseded policies.

The Local Plan 2024 points the same way. Policy CD12 lists buildings whose roof construction and style make them unsuitable for additional storeys, giving pitched roofs with eaves as its example, and its supporting text says original dormers that remain should be conserved, noting that enlarging dormers can cause overheating, south-facing ones especially. On a villa, plan for a dormer of the house’s proportions rather than a new storey.

We photograph the villa’s hip and the dormers along the road, measure the original windows, and size and detail a dormer to match.

## Varied mansards and lost balustrades along Penywern Road

On Penywern Road, the 2016 appraisal says nos. 9-49 (odd) and 20-56 (even) repeat the design of nos. 2-18 and 1-7 but add a full fourth storey crowned by a secondary cornice and balustrade. Many of these houses now have mansards of varying designs, which have disrupted the roofline and seen bottle balustrades removed, particularly from the terrace houses on the south side.

The appraisal gives modern mansards much lower heritage value, yet counts them part of the area’s character where they cover the majority of a terrace and are of an appropriate design; a lone roof extension among unaltered roofs, or one of a different design, has a negative impact on the street scene. Policy CD12 requires any roof alteration to sit sympathetically with the building’s own form and with its group.

We record each mansard on your side of the road, note where balustrades survive, and draw a mansard that matches the prevailing design and keeps surviving balustrades.

## Mansard gaps on Nevern Square and oversized roofs on Templeton Place

RBKC’s Nevern Square appraisal, adopted on 4 October 2018, describes continuous parapet rooflines and tall chimney stacks as a key feature: the Italianate and Domestic Revival terraces were built to look like single units, joined by a long shared parapet with a cornice in brick or stucco, or a balustrade. Some roofs have since become mansards whose windows show above the parapet.

Where a whole terrace has been extended that way, the appraisal says uniformity, though not appearance, has been preserved. Where gaps remain, as on the north-eastern side of Nevern Square, it finds harm and says uniformity could be reinstated by infilling them. It also names oversized, very poorly designed mansards on Templeton Place and at the north end of Trebovir Road as harmful, so an infill needs to match the row in size as well as form.

We count the mansards and gaps in your terrace, measure the neighbouring mansards’ height and set-back, and design an infill no larger than the row it joins.

## Infill mansards in Eardley Crescent and Philbeach Gardens’ unbroken parapets

The Philbeach Conservation Area, designated in January 1993, has its own appraisal of 4 October 2018. It says flat parapet rooflines are a key feature of the Classically inspired houses it describes, and that most houses on Eardley Crescent and Kempsford Gardens have set-back mansards with small sash windows, inoffensive in the main, though some moulded stucco lost from the parapets is a great loss to the streets.

Because many houses there have mansards, the appraisal says “there would be no harm in infilling the gaps” where they are missing. Philbeach Gardens is different: its unbroken parapets, which terminate the facades as originally intended, are “one of the great strengths of this conservation area that should be preserved”, and the appraisal says most houses in the area have flat roofs behind their parapets, so the first question there is whether any roof space exists to use.

On Eardley Crescent or Kempsford Gardens we follow the set-back and small sashes of the neighbouring mansards and record any lost parapet stucco; on Philbeach Gardens we survey the roof void first.

## How an Earl’s Court loft project runs

RBKC decides applications across Earl’s Court’s four conservation areas, under its Local Plan 2024, adopted on 24 July 2024. Its Policy CD4 means a full application, not an outline, while paragraph B.1(f) leaves a conservation-area house without Class B rights, so a mansard or dormer there needs planning permission. The Earl’s Court Square appraisal records nos. 30-52 there as Grade II listed, so listed building consent is also needed wherever work would affect their special character, and several streets carry Article 4 directions.

### Design and consent, step by step

1. **Feasibility visit and survey.** We measure the roof space (the ridge height, the rafter pitch, the purlins and the chimney breasts) and check whether the address is in a conservation area, under an Article 4 direction or listed, so you hear which loft types fit and which approvals route applies.
2. **Design and structural engineering.** Our in-house architects, designers and structural engineers draw the layout, the stair, the steelwork and the new floor, so that the roof the council is asked to accept is the one the structure is designed for.
3. **Approvals.** We prepare the planning or lawful development certificate application, any listed building consent application and the Building Regulations drawings. For development that is not major development, article 34(2)(b) of the Town and Country Planning (Development Management Procedure) (England) Order 2015 gives the Royal Borough of Kensington and Chelsea 8 weeks beginning with the day immediately following that on which the application is received, unless a longer period is agreed in writing; article 39(10)(a) gives the same 8 weeks for a lawful development certificate. Under the Party Wall etc. Act 1996, a party structure notice must be served at least two months before work to a party wall begins (section 3(2)(a)), and notice of a new wall on the line of junction (section 1) or of excavation near a neighbour’s foundations (section 6(5)) at least one month before; if the adjoining owner does not consent to a party structure notice or an excavation notice within 14 days, a dispute is deemed to have arisen (sections 5 and 6(7)).
4. **Build.** Scaffolding goes up, the roof is opened under temporary weatherproofing, the steel, the new floor and the dormer or mansard go in, and the roof is made weathertight before the insulation, the stair, services and finishes.
5. **Completion and handover.** Building control makes its final inspection and issues the completion certificate; we hand over the loft with its certificates, and the 12-month aftercare/defects period starts.

We publish no standard duration for a loft; we provide a detailed programme at contract stage. Nor do we publish a price: the cost follows from the loft type, the structure, the stair, the approvals, fire safety and insulation, the bathroom and finishes, and access for scaffolding and materials, and a written quotation follows the survey and the agreed specification.

Insurance: £5M public liability, £10M employers' liability and contractors' all risks cover.

Independent surveying by our sister practice, [Hampstead Chartered Surveyors & Building Consultancy](https://www.hampsteadcharteredsurveyors.co.uk/).

Book a feasibility visit: we reply within one working day, Monday to Friday, 8am to 6pm.

## A comparable project

This comparable job is outside Earl’s Court, on the King’s Road in Chelsea, SW3, about 2 km away, and was an office building turned to retail and residential use. Its new mansard extension compares with an infill in an Earl’s Court row: the conservation officer was satisfied once the design had reached its third version.

## Questions about lofts in Earl’s Court

### Which conservation area appraisal covers my Earl’s Court street?

RBKC has adopted four: Earl’s Court Square (6 June 2016), Earl’s Court Village (16 February 2017), and Nevern Square and Philbeach (both 4 October 2018). The Village and Philbeach appraisals place those areas in the borough’s Earl’s Court Ward. The Village appraisal says the area has kept the vast majority of its original roof forms intact, including original mansards on the large Italianate terraced houses of Hogarth Road and nos. 1-7 (odd) Knaresborough Place. We match your address to its appraisal first.

### Do Article 4 directions cover roof work on Earl’s Court streets?

RBKC’s register, last updated on 17 October 2025, lists direction 36 of 1978 for set numbers in Earl’s Court Square, and direction 76 of 1999 for numbered houses on Eardley Crescent, Kempsford Gardens, Nevern Square and Philbeach Gardens. RBKC’s page describes what its conservation-area directions generally aim at, small changes to house exteriors that can include roof coverings, often on the front; it does not say which works directions 36 and 76 cover. The Philbeach appraisal says a direction there requires permission before painting a house. We have not seen direction 76’s text, so we read it for your number.

### Can the top flat of an Earl’s Court Square mansion block build upwards?

Only through a planning application. RBKC’s Local Plan 2024 says buildings such as mansion blocks do not have the permitted development rights of dwellinghouses. The 2016 Earl’s Court Square appraisal adds that the square’s mansion blocks already have living accommodation within the roof, lit by windows in the gables or by dormers, so the roof may already be in use. Your lease is a separate document to read, since depending on its terms it may require the landlord’s consent.

### Does a house need planning permission for a dormer on its rear slope?

Not if it fits Class B of the Town and Country Planning (General Permitted Development) (England) Order 2015, which covers additions to a house roof. Its limits include keeping the work no higher than the existing roof’s highest point and not beyond the plane of the principal roof slope facing a highway, with the enlarged roof space up to 40 cubic metres larger than the original for a terraced house, or 50 for others. It does not reach flats, or houses where “the dwellinghouse is on article 2(3) land”; that land takes in conservation areas.

### Can new loft beams be built into the party wall?

The Party Wall etc. Act 1996 lists among a building owner’s rights, in s.2(2)(f), “to cut into a party structure for any purpose”, which takes in pockets for beam ends. Section 3(1) puts a party structure notice, served on every adjoining owner, before the work. Where consent does not follow within the Act’s period, s.5 deems a dispute, and s.10(1) has it settled by one agreed surveyor or by two, one for each owner, with a third chosen by them.

## Official sources for this page

Official documents relied on for this page, opened on 25 November 2026. Dates and status are given in the text where they matter.

- [RBKC, Conservation area appraisals and proposal statements](https://www.rbkc.gov.uk/planning-and-building-control/heritage-and-conservation/conservation-areas-0/conservation-area-appraisals-and-proposal-statements)
- [Royal Borough of Kensington and Chelsea: Earl's Court Square Conservation Area Appraisal](https://planningconsult.rbkc.gov.uk/gf2.ti/f/708866/21143845.1/PDF/-/Earls_Court_Sq_CAA__low_res.pdf)
- [Royal Borough of Kensington and Chelsea: Earl's Court Village Conservation Area Appraisal](https://planningconsult.rbkc.gov.uk/gf2.ti/f/789890/25114341.1/PDF/-/Earls_Court_Village_CAA__lowres.pdf)
- [Royal Borough of Kensington and Chelsea: Nevern Square Conservation Area Appraisal](https://planningconsult.rbkc.gov.uk/gf2.ti/f/968130/41800389.1/PDF/-/Nevern_Square_CAA__FINAL.pdf)
- [Royal Borough of Kensington and Chelsea: Philbeach Conservation Area Appraisal](https://planningconsult.rbkc.gov.uk/gf2.ti/f/968194/41801509.1/PDF/-/Philbeach_CAA__FINAL.pdf)
- [RBKC, Article 4 Directions in Conservation Areas](https://www.rbkc.gov.uk/planning-and-building-control/heritage-and-conservation/article-4-directions-conservation-areas)
- [Royal Borough of Kensington and Chelsea: Local Plan 2024 (PDF titled 'RBKC Local Plan 2024 Clean Version')](https://www.rbkc.gov.uk/media/document/new-local-plan-july-2024-)
- [The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class B (additions etc to the roof of a dwellinghouse)](https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/1/crossheading/class-b-additions-etc-to-the-roof-of-a-dwellinghouse)
- [The Town and Country Planning (General Permitted Development) (England) Order 2015, article 2 (interpretation)](https://www.legislation.gov.uk/uksi/2015/596/article/2)
- [The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 1, Part 1 (article 2(3) land)](https://www.legislation.gov.uk/uksi/2015/596/schedule/1/part/1)
- [Planning (Listed Buildings and Conservation Areas) Act 1990, section 7](https://www.legislation.gov.uk/ukpga/1990/9/section/7)
- [Party Wall etc. Act 1996, sections 1, 2, 3, 5, 6 and 10](https://www.legislation.gov.uk/ukpga/1996/40/contents)
- [The Town and Country Planning (Development Management Procedure) (England) Order 2015, article 34 (time periods for decisions)](https://www.legislation.gov.uk/uksi/2015/595/article/34)
- [The Town and Country Planning (Development Management Procedure) (England) Order 2015, article 39 (certificate of lawful use or development)](https://www.legislation.gov.uk/uksi/2015/595/article/39)