Bathroom Renovation project in Earl's Court Square by Hampstead Renovations — premium refurbishment delivery
Price GuideEarl's Court Square SW5

Bathroom Renovation Prices in Earl's Court Square

Complete bathroom design and installation services. Budget realistically with a published range from £8,000 to £40,000, backed by clearer scope notes, delivery context, and direct office guidance before you commit.

From £8,000Typical programme 2-4 weeksNo hidden fee positioning

Transparent scope

Every quote is broken down clearly so you can compare tiers, finishes, and allowances without guesswork.

Local delivery context

We price around Earl's Court Square access, property type, and programme constraints rather than using a generic London average.

Office-first support

You can speak to the office for budgeting, specification, and scheduling before booking a site visit.

Cost planning

Bathroom Renovation price guide for Earl's Court Square

Use these ranges to shortlist the right level of specification, then speak to the office for a more precise scope review based on your property, access, and finish standard.

Budget band

Standard

Quality bathroom suite with modern fittings

Typical budget

£8,000 - £12,000

  • Quality sanitaryware
  • Ceramic tiling
  • Chrome fixtures
  • New lighting
  • Extractor fan

Best when you want quality bathroom suite with modern fittings without losing control of scope.

Most requested range

Premium

Designer bathroom with luxury features

Typical budget

£12,000 - £20,000

  • Designer sanitaryware
  • Large format tiles
  • Rainfall shower
  • Underfloor heating
  • Heated towel rails

Best when you want designer bathroom with luxury features without losing control of scope.

Budget band

Luxury

Spa-quality bathroom experience

Typical budget

£20,000 - £40,000

  • Freestanding bath
  • Walk-in wet room
  • Natural stone
  • Smart mirrors
  • Built-in storage

Best when you want spa-quality bathroom experience without losing control of scope.

Cost drivers

What moves your bathroom renovation budget in Earl's Court Square?

The published range is shaped by specification, property condition, and how much preparatory or structural work is needed before finishes can start.

Price signal

£8,000 to £40,000

This spread reflects entry, mid, and premium delivery tiers rather than an artificially compressed headline figure.

1

Bathroom size

This is one of the first items we review when turning a broad guide price into a fixed quotation for your property.

2

Structural changes

This is one of the first items we review when turning a broad guide price into a fixed quotation for your property.

3

Tile selection

This is one of the first items we review when turning a broad guide price into a fixed quotation for your property.

4

Fixture quality

This is one of the first items we review when turning a broad guide price into a fixed quotation for your property.

5

Accessibility needs

This is one of the first items we review when turning a broad guide price into a fixed quotation for your property.

Included in the quote

What is normally covered in our bathroom renovation pricing

Design service
Plumbing
Electrical
Tiling
Waterproofing
Decoration

Typical programme

2-4 weeks

Final sequencing is confirmed once the survey and scope are agreed.

Warranty cover

5 years on installation, 10 years on waterproofing

Installation and structural protections are set out clearly in your quote pack.

Quoted with

Labour, materials, management

Our published ranges are designed to reflect real delivery, not stripped-back headline numbers.

Local next step

Need the area view before deciding?

Review the main Earl's Court Square hub to compare services, nearby coverage, and broader renovation context before requesting a fixed price.

View Earl's Court Square coverage page

Interactive estimator

Bathroom Renovation Cost Calculator for Earl's Court Square

Drag the slider to set your floor area and pick a specification tier. The estimate updates live using Earl's Court Square-specific pricing data.

80 sqm
30 sqm (small flat)400 sqm (large house)

Specification tier

Designer fixtures, bespoke joinery, premium worktops, smart-home pre-wire.

£150 / sqm at premium tier

Estimated total

£12,000

Likely range: £10,800£13,800

Base (Premium × 80 sqm)£12,000
Earl's Court Square multiplier× 1.00
Adjusted total£12,000

This estimate is a starting point. Final pricing depends on property condition, specification choices, and access constraints. We provide a fixed-price written quote after a free site survey.

Room-by-room

Bathroom Renovation Specification by Room in Earl's Court Square

Every bathroom renovation project breaks down into rooms with different scopes, costs, and durations. Below is the typical specification we deliver across Earl's Court Square properties.

Kitchen

Bespoke or premium-fit kitchen in Earl's Court Square including units, worktops, integrated appliances, lighting, plumbing, electrical, and finishes coordinated as a single trade package.

Typical cost

£12,000 – £45,000

Duration

3 – 5 weeks

  • Survey-led design with 3D visualisations
  • Premium quartz, marble, or sintered-stone worktops
  • Integrated Miele, Siemens, Bosch, Wolf or Sub-Zero appliances available
  • Concealed extraction routed to comply with conservation-area facade controls
  • Bespoke joinery for pantries, breakfast bars, and built-in seating

Bathrooms

Family bathrooms, en-suites, and cloakrooms designed for Earl's Court Square property layouts. Stone, mosaic, large-format, or wet-room solutions.

Typical cost

£8,000 – £28,000 per room

Duration

2 – 4 weeks per room

  • Premium British, Italian, and German sanitaryware ranges
  • Underfloor heating with insulated screed and digital thermostats
  • Large-format porcelain, stone, marble, or tadelakt finishes
  • Walk-in showers with framed or frameless glass enclosures
  • Acoustic insulation between flats where required by lease

Living Areas

Open-plan reception, dining, and family spaces. Where structure permits we open through party walls with steel beams to maximise light and flow in Earl's Court Square period properties.

Typical cost

£10,000 – £35,000

Duration

4 – 6 weeks

  • Engineered-oak or stone flooring throughout open-plan layouts
  • Period cornicing, ceiling roses, and architraves restored or re-cast
  • Bespoke media walls, joinery, and built-in storage solutions
  • Smart lighting circuits with scene control and dimming throughout
  • Tall slim-frame doors and crittall-style internal glazing

Bedrooms

Master suites, family bedrooms, and study/guest rooms. Built-in storage, lighting, smart-home pre-wire, and acoustic treatments where appropriate for Earl's Court Square living patterns.

Typical cost

£4,500 – £18,000 per room

Duration

2 – 3 weeks per room

  • Full-height fitted wardrobes with internal lighting and soft-close drawers
  • Bedside circuits for USB-C, lamps, and integrated reading lights
  • Acoustic insulation in walls and floors for peaceful sleep
  • Period sash window restoration with double-glazed slim units
  • Integrated dressing rooms and en-suite reconfigurations

Hallways & Stairs

Entrance halls, landings, and stairwells — often the first impression in Earl's Court Square period homes. We restore or replace balustrades, treads, doors, and floors as a coherent design statement.

Typical cost

£3,500 – £14,000

Duration

2 – 3 weeks

  • Original timber stair restoration including treads, risers, and handrails
  • Encaustic tile floors restored or replaced with reclaimed equivalents
  • New panelled doors and bespoke architraves matching period detail
  • Period plaster cornicing and dado rails restored
  • Modern intercom, smart-lock, and parcel-locker integration

Services & Utilities

Boiler, hot-water cylinder, consumer unit, MVHR, electrical and plumbing infrastructure replaced or upgraded across the property. Often the hidden backbone of a bathroom renovation project in Earl's Court Square.

Typical cost

£8,000 – £25,000

Duration

2 – 4 weeks (concurrent with other trades)

  • Full rewire to current 18th edition standards with NICEIC certification
  • Replumb in PEX or copper with manifold distribution
  • New boiler, cylinder, and zoned heating with smart controls
  • MVHR systems for tightly-sealed retrofits where appropriate
  • EV charger and consumer-unit upgrades anticipating future loads

Decision framework

Refurbish or Rebuild: Choosing the Right Approach in Earl's Court Square

The biggest single decision on a bathroom renovation project is whether to refurbish the existing property or demolish and rebuild. Here's how we frame the trade-offs for Earl's Court Square owners.

1How much of the existing structure is sound?

Refurbish

Most Earl's Court Square period homes have sound brick, timber, and roof structures that are worth retaining. Refurbishment preserves character and avoids planning risk.

Rebuild

If the existing structure has serious subsidence, fire damage, or non-compliant additions, demolition and rebuild may be the cleaner route.

Our recommendation

Refurbish unless a structural engineer flags major issues at survey.

2What does the planning landscape allow?

Refurbish

Conservation areas in Earl's Court Square typically restrict demolition. Refurbishment, with permitted-development additions, is usually faster to consent.

Rebuild

New-build replacement requires full planning consent and often an environmental impact assessment. Listed buildings rule out rebuild entirely.

Our recommendation

Refurbish for almost all conservation-area and listed properties.

3How does the budget compare?

Refurbish

Refurbishment costs typically £1,200 – £2,500 per sqm for premium spec, with shorter programmes and lower professional fees.

Rebuild

New-build costs £3,000 – £5,000+ per sqm in prime London, plus 18-30 months of design, planning, and demolition costs.

Our recommendation

Refurbish for £1m – £3m budgets; rebuild only justified above £3m on the right plot.

4What is the energy and comfort upgrade gap?

Refurbish

Internal wall insulation, MVHR, and slim-double-glazed sashes can lift period homes to EPC C/B without altering external appearance.

Rebuild

New-build can hit EPC A and Passivhaus standards with mechanical ventilation, triple glazing, and air-tight detailing.

Our recommendation

Refurbishment usually closes the comfort gap at lower cost in period properties.

5What about resale value and marketability?

Refurbish

Refurbished Earl's Court Square period homes command a premium for character. Buyers in this market value original features.

Rebuild

New-build replacements in period streets can struggle to match comparable refurbished sale values.

Our recommendation

Refurbish if your property has period character. Rebuild only on plots without heritage value.

How we sequence the build

Sequencing Your Bathroom Renovation Project

An 18-week bathroom renovation project breaks into 8 phases, each with specific trades, deliverables, and risks. Understanding the sequence helps you anticipate questions, decisions, and on-site moments.

Phase 1: Pre-construction

Weeks -8 to -2

Trades on site

Architect Structural engineer Surveyor Project manager

Deliverables

  • Full survey including drains, services, and structural integrity
  • Detailed design package with specifications and material schedule
  • Planning permission and Building Control submissions where required
  • Party Wall agreements coordinated with neighbours
  • Fixed-price contract with itemised quote

Risk note

Hidden defects (damp, asbestos, non-compliant additions) are usually discovered here — budget a 10% contingency.

Phase 2: Site setup & strip-out

Weeks 1 – 2

Trades on site

Site manager Strip-out crew Skip and waste contractors

Deliverables

  • Site protection: dust screens, floor coverings, scaffold
  • Strip-out of all existing finishes, fittings, and services
  • Confirmation of structural condition once exposed
  • Asbestos survey and remediation if pre-1999 property
  • Final scope confirmation with client

Risk note

Strip-out always reveals more than the survey predicted. Quick decision-making protects programme.

Phase 3: Structural works

Weeks 2 – 5

Trades on site

Structural engineer Steel fixers Bricklayers Carpenters

Deliverables

  • Steel beams, posts, and lintels installed per engineer's design
  • Wall removals, openings, and structural alterations
  • Foundation works for new walls or extensions
  • New floor structures and joist work where required
  • Building Control structural inspection and sign-off

Risk note

Steel fabrication lead times can run 4-6 weeks — order early to avoid programme delay.

Phase 4: First-fix services

Weeks 5 – 8

Trades on site

Electricians Plumbers Heating engineers Insulation contractors

Deliverables

  • Full rewire to 18th edition standards with NICEIC certification
  • New plumbing in PEX or copper with manifolds
  • Heating system installation: boiler, cylinder, MVHR if specified
  • Insulation to walls, floors, and roof
  • First-fix for AV, smart home, security, and data

Risk note

First-fix sequencing matters: services must be coordinated to avoid clashes before plastering.

Phase 5: Plastering & flooring substrate

Weeks 8 – 11

Trades on site

Plasterers Floor screeders Carpenters Tilers (substrate)

Deliverables

  • Full skim plastering throughout
  • Floor screeding with underfloor heating where specified
  • Internal stud walls, ceilings, and architectural detailing
  • Window and door reveals finished
  • Subfloor preparation for finished flooring

Risk note

Plaster needs proper drying time (1 week per coat) — rushing this stage risks cracking and finish defects.

Phase 6: Second-fix services

Weeks 11 – 13

Trades on site

Electricians Plumbers Heating engineers AV installers

Deliverables

  • All sockets, switches, and lighting fittings installed
  • Sanitaryware, taps, showers, and radiators connected
  • Boiler commissioning and heating zoning configured
  • Smart home, AV, and security systems commissioned
  • Building Control electrical inspection

Risk note

Specification of fittings should be locked before week 8 to avoid lead-time delays.

Phase 7: Joinery, kitchens & bathrooms

Weeks 13 – 16

Trades on site

Bespoke joiners Kitchen fitters Stone fitters Tilers

Deliverables

  • Bespoke joinery installation: wardrobes, media walls, pantries
  • Kitchen units, worktops, splashbacks, and appliances fitted
  • Bathroom tiling, sanitaryware, and shower screens
  • Internal doors, architraves, and skirting installed
  • Stair restoration or replacement completed

Risk note

Stone worktops require templating after units are installed — adds 2 weeks lead time.

Phase 8: Finishing & handover

Weeks 16 – 18

Trades on site

Decorators Floor finishers Cleaners Snagging team

Deliverables

  • Decoration: full mist coat, undercoat, two top coats
  • Floor finishes laid: engineered timber, stone, or carpet
  • Final clean and snagging walkthrough
  • Building Control sign-off and warranty paperwork
  • Handover pack with manuals, certificates, and aftercare schedule

Risk note

Final 5% of works always takes 20% of effort. Defect-free handover requires methodical snagging.

Case studies

Bathroom Renovation Case Studies in Earl's Court Square

Three recent projects showing how briefs, budgets, and constraints translate into delivered outcomes for Earl's Court Square properties.

Project 1

Period townhouse bathroom renovation in Earl's Court Square

Duration

18 weeks on site

Budget

£185,000 – £220,000

Scope

Whole-house bathroom renovation of a 4-bed period property: full rewire, replumb, new kitchen, three bathrooms, and bespoke joinery throughout.

Before

Tired 1990s refit with worn carpets, dated bathrooms, single-glazed sashes, and a leaking flat roof. EPC rating D.

  • EPC rating: D (62)
  • Heating cost: £2,800/year
  • 3 bathrooms (worn)
  • Single-glazed sashes
  • Boiler age: 18 years

After

Premium family home with restored period features, premium kitchen and bathrooms, smart-home integration, and EPC rating C.

  • EPC rating: C (74)
  • Heating cost: £1,400/year
  • 3 premium bathrooms
  • Slim-double-glazed sashes
  • New A-rated combi

Challenge

Conservation-area consent required for sash window upgrades and new dormer at rear. Family wanted to remain in property for first 4 weeks.

Solution

Phased works with ground-floor rooms completed first as habitable zone. All planning consent secured before strip-out.

"They handled the conservation officer brilliantly and the period detailing is better than the original. We could not be happier."

Project 2

Mansion-block flat bathroom renovation in Earl's Court Square

Duration

12 weeks on site

Budget

£95,000 – £125,000

Scope

Premium flat bathroom renovation: full rewire, replumb, new kitchen, two bathrooms, acoustic insulation, and managing-agent coordination.

Before

Tired 1980s refit, electric storage heaters, no acoustic insulation, dated kitchen and bathrooms.

  • EPC rating: E (52)
  • Heating cost: £2,200/year
  • No acoustic insulation
  • 2 bathrooms (1 worn)
  • Electric storage heaters

After

Premium apartment with new gas central heating, acoustic insulation, designer kitchen, and stone bathrooms. EPC C.

  • EPC rating: C (76)
  • Heating cost: £950/year
  • Full Part E acoustic insulation
  • 2 stone bathrooms
  • Gas central heating

Challenge

Strict managing-agent rules: 8am–5pm working hours, lift bookings, no Saturday work, deposit £5k for communal-area damage.

Solution

Detailed method statement and risk assessment submitted upfront. Lift and porter slots booked weeks ahead. Communal areas protected daily.

"The managing agent said they'd never seen a contractor coordinate so well. Worth every penny for that alone."

Project 3

Family extension and refurb in Earl's Court Square

Duration

22 weeks on site

Budget

£235,000 – £275,000

Scope

Side-return extension, full kitchen replacement, ground-floor reconfiguration, plus full upstairs refurbishment.

Before

Closed-off Victorian layout with narrow galley kitchen, cellular reception rooms, and tired upstairs bathrooms.

  • Floor area: 142 sqm
  • EPC: D
  • Original layout: 7 rooms
  • £0 added value

After

Open-plan kitchen-dining-family living across rear, restored front reception, three new bathrooms, and converted loft bedroom.

  • Floor area: 178 sqm (+25%)
  • EPC: C
  • New layout: 9 rooms
  • £420k added value (estimated)

Challenge

Permitted-development limits, party wall agreement with two neighbours, and a tight side-return access.

Solution

Crane delivery for steels over rear roof. Both party wall agreements secured pre-start. Architect-led design package.

"They turned a tired family house into the home of our dreams without losing the character. Best decision we made."

Bathroom Renovation Pricing FAQs - Earl's Court Square

Find answers to common questions about our services.

Bathroom Renovation in Earl's Court Square typically ranges from £8,000 to £40,000. The exact price depends on: Bathroom size, Structural changes, Tile selection. HAMPSTEAD RENOVATIONS provides free, no-obligation quotes for Earl's Court Square properties.
Our bathroom renovation price includes: Design service, Plumbing, Electrical, Tiling, Waterproofing, Decoration. There are no hidden extras - we believe in complete transparency. The quote you receive is the price you pay.
Bathroom Renovation typically takes 2-4 weeks. The exact duration depends on project complexity and any specific requirements for Earl's Court Square properties. We provide detailed timelines with every quote.
HAMPSTEAD RENOVATIONS provides 5 years on installation, 10 years on waterproofing. We stand behind our work with comprehensive guarantees that give you complete peace of mind.
HAMPSTEAD RENOVATIONS offers transparent pricing with no hidden fees, local expertise in Earl's Court Square properties, comprehensive warranties, and published review evidence across London. Our current aggregate rating is 4.9 from 183 published reviews.

Speak to the office

Get a sharper bathroom renovation quote for Earl's Court Square

Call the office for budgeting and programme guidance, or send your brief for a fuller written quotation. We will explain what is included, what can move cost, and which tier best fits your property.

Typical start point

£8,000

Published rating

4.9 / 5

Across 183 published reviews.

Best first call

Office for budgeting, mobile for quick response

WhatsApp