Bathroom Renovation Preparation Checklist
Everything you need to prepare before your bathroom renovation begins
When to Use This Checklist:
Start this checklist 2 weeks before your bathroom renovation is scheduled to begin.
A well-prepared bathroom renovation runs smoother and finishes faster. This checklist will help you make all the necessary decisions and preparations before your contractor arrives, minimising delays and ensuring you get the bathroom you want.
1. Design Decisions
Finalise layoutImportant
Confirm positions of all fixtures with your contractor. Changes mid-project are costly.
Choose all fixtures
Bath/shower, toilet, basin, taps - all should be selected and ordered in advance.
Select all tilesImportant
Wall and floor tiles plus trim pieces. Order 10% extra for cuts and future repairs.
Choose paint colours
If walls are being painted, select moisture-resistant bathroom paint.
Pick accessories
Towel rails, mirror, toilet roll holder, shower screen - all need specifying.
Confirm lighting
Position and style of all lights. Must be bathroom-rated IP zones.
2. Practical Preparations
Arrange alternative facilitiesImportant
You won't have access to this bathroom during work. Plan alternatives.
Clear the bathroom
Remove all toiletries, towels, medicines, and personal items.
Protect nearby areas
Dust will spread - consider moving items from adjacent rooms.
Check access
Ensure tradespeople can easily access for deliveries and waste removal.
Arrange parking permits
If needed for contractor vehicles or skip lorries.
3. Before Work Starts
Confirm start date and schedule
Get a written timeline with key milestones.
Take photos
Document the existing bathroom for records and any insurance purposes.
Confirm quotes and paymentsImportant
Agree payment schedule. Never pay everything upfront.
Discuss daily routine
Start times, tea/coffee, toilet access, working hours.
Exchange contact details
Mobile numbers for easy communication during the project.
4. Materials Checklist
Bathroom suite delivered
Bath/shower tray, toilet, basin - check for damage immediately.
Tiles and adhesive
All tiles, grout, adhesive, and trims delivered and checked.
Taps and fittings
All taps, wastes, and fittings present and correct.
Shower valve and head
If having a shower, ensure all parts are ready.
Extras and accessories
Towel rails, mirror, hooks, cabinets all ready.
💡 Helpful Tips
- ✓Visit showrooms to see fixtures in person - online images can be misleading
- ✓Consider future needs - grab rails and level access are easier to add during renovation
- ✓Underfloor heating is much cheaper to install during renovation than after
- ✓Get samples of tiles and test them in your bathroom lighting before ordering
⚠️ Important Warnings
- !Never pay the full amount upfront - stage payments are industry standard
- !Check all deliveries immediately and report damage within 24 hours
- !Ensure your contractor has public liability insurance
Need Professional Help?
If any of these tasks seem complex or you'd prefer professional assistance, we offer the following services:
Related Checklists
Need Help With Home Maintenance?
Our team of experts can handle any task on this checklist. Get a free quote today.
HAMPSTEAD RENOVATIONS - Your trusted property renovation company in Hampstead and refurbishment company in Hampstead
https://www.hampsteadrenovations.co.uk/ | Email: contact@hampsteadrenovations.co.uk