Building21 tasks⏱️ ~1-2 weeks before work startsMedium

Bathroom Renovation Preparation Checklist

Everything you need to prepare before your bathroom renovation begins

When to Use This Checklist:

Start this checklist 2 weeks before your bathroom renovation is scheduled to begin.

A well-prepared bathroom renovation runs smoother and finishes faster. This checklist will help you make all the necessary decisions and preparations before your contractor arrives, minimising delays and ensuring you get the bathroom you want.

1. Design Decisions

Finalise layoutImportant

Confirm positions of all fixtures with your contractor. Changes mid-project are costly.

Choose all fixtures

Bath/shower, toilet, basin, taps - all should be selected and ordered in advance.

💡 Pro Tip:Order 4 weeks early for non-stock items.

Select all tilesImportant

Wall and floor tiles plus trim pieces. Order 10% extra for cuts and future repairs.

Choose paint colours

If walls are being painted, select moisture-resistant bathroom paint.

Pick accessories

Towel rails, mirror, toilet roll holder, shower screen - all need specifying.

Confirm lighting

Position and style of all lights. Must be bathroom-rated IP zones.

2. Practical Preparations

Arrange alternative facilitiesImportant

You won't have access to this bathroom during work. Plan alternatives.

Clear the bathroom

Remove all toiletries, towels, medicines, and personal items.

Protect nearby areas

Dust will spread - consider moving items from adjacent rooms.

Check access

Ensure tradespeople can easily access for deliveries and waste removal.

Arrange parking permits

If needed for contractor vehicles or skip lorries.

3. Before Work Starts

Confirm start date and schedule

Get a written timeline with key milestones.

Take photos

Document the existing bathroom for records and any insurance purposes.

Confirm quotes and paymentsImportant

Agree payment schedule. Never pay everything upfront.

Discuss daily routine

Start times, tea/coffee, toilet access, working hours.

Exchange contact details

Mobile numbers for easy communication during the project.

4. Materials Checklist

Bathroom suite delivered

Bath/shower tray, toilet, basin - check for damage immediately.

Tiles and adhesive

All tiles, grout, adhesive, and trims delivered and checked.

Taps and fittings

All taps, wastes, and fittings present and correct.

Shower valve and head

If having a shower, ensure all parts are ready.

Extras and accessories

Towel rails, mirror, hooks, cabinets all ready.

💡 Helpful Tips

  • Visit showrooms to see fixtures in person - online images can be misleading
  • Consider future needs - grab rails and level access are easier to add during renovation
  • Underfloor heating is much cheaper to install during renovation than after
  • Get samples of tiles and test them in your bathroom lighting before ordering

⚠️ Important Warnings

  • !Never pay the full amount upfront - stage payments are industry standard
  • !Check all deliveries immediately and report damage within 24 hours
  • !Ensure your contractor has public liability insurance

Need Professional Help?

If any of these tasks seem complex or you'd prefer professional assistance, we offer the following services:

Need Help With Home Maintenance?

Our team of experts can handle any task on this checklist. Get a free quote today.

07459 345456
020 8054 8756
24/7 Emergency Line
Unit 3, Palace Court, 250 Finchley Road
London, NW3 6DN
07:00 - 19:00
Mon-Fri

HAMPSTEAD RENOVATIONS - Your trusted property renovation company in Hampstead and refurbishment company in Hampstead

https://www.hampsteadrenovations.co.uk/ | Email: contact@hampsteadrenovations.co.uk

24/7 Emergency

07459 345456